Project introduction:
The project has 184 condominiums and some business units. It is a commercial and residential project. The total height of the building is about 250 feet.
Including:
Projects completed before 2019: Planning approval, construction drawing design, foundation engineering construction permit approval, house pre-sale permit.
The project has started in March 2019.
Due to the collaboration with the Hawaii Department of Health on the soil reporting project and the impact of COVID-19, the soil reporting project for the current project has been completed.
During the period of 2025-2026, the construction drawings are being revised. The originally approved planning drawings are retained, including 184 condominiums, 3 commercial shops on the first floor, and the original approved floor plans remain unchanged. The structural engineering construction drawings are being revised. The original land property division is retained. The original approvals from the planning department and the municipal government council (TOD) for the special transportation area project are retained. The pre-sale permits for the houses are also retained.
Latest commencement date of the project:
The project is planned to commence in October 2026, be completed in
August 2029, and obtain the residence permit and property ownership
certificate in December 2029.
View of the street view of the project in Honolulu: Click here
Contact:
Cell: 808-800-4999
Add: 27 NEW INDUSTRIAL ROAD, #01-01 NOVELTY TECHPOINT, Singapore 536212