Welcome: NEW HOME GROUP,WWW.NEW99HOME.COM
Language: Chinese ∷  English

Projects under investment

Hawaii City Plaza
  • Hawaii City Plaza
  • Hawaii City Plaza
  • Hawaii City Plaza
  • Hawaii City Plaza
  • Hawaii City Plaza
  • Hawaii City Plaza
  • Hawaii City Plaza
Hawaii City PlazaHawaii City PlazaHawaii City PlazaHawaii City PlazaHawaii City PlazaHawaii City PlazaHawaii City Plaza

Project introduction:

The project has 184 condominiums and some business units. It is a commercial and residential project. The total height of the building is about 250 feet.

Including:

  • Three retail commercial stores and some parking lots on the first floor.
  • Parking lots on the 2nd to 5th floor.
  • Public facilities on the 6th floor, including swimming pool, owners' activity center, GYM, small theater, Children's activity area and 4 residential units.
  • Affordable housing on the 6th floor(1 unit) to 10th floor.
  • Condominiums sold at market price on the 6th floor(3 units) and on the 11th floor to 27th floor (No 13th floor).
  • The parking space and public support area of the project is approximately 180,000 square feet.
  • 184 condominiums cover an area of approximately 140,000 square feet.
  • The commercial area is about 7,000 square feet.
  • This is a real estate development project with the standards of hotel property management.

Projects completed before 2019: Planning approval, construction drawing design, foundation engineering construction permit approval, house pre-sale permit.

The project has started in March 2019.

Due to the collaboration with the Hawaii Department of Health on the soil reporting project and the impact of COVID-19, the soil reporting project for the current project has been completed.

During the period of 2025-2026, the construction drawings are being revised. The originally approved planning drawings are retained, including 184 condominiums, 3 commercial shops on the first floor, and the original approved floor plans remain unchanged. The structural engineering construction drawings are being revised. The original land property division is retained. The original approvals from the planning department and the municipal government council (TOD) for the special transportation area project are retained. The pre-sale permits for the houses are also retained.

Latest commencement date of the project:
The project is planned to commence in October 2026, be completed in August 2029, and obtain the residence permit and property ownership certificate in December 2029.

View of the street view of the project in Honolulu: Click here

No previousNEXT:Ala Moana Home

LATEST NEWS

CONTACT US

Contact:

Cell: 808-800-4999

Add: 27 NEW INDUSTRIAL ROAD, #01-01 NOVELTY TECHPOINT, Singapore 536212